VANCOUVER, May 31, 2012 /CNW/ - Wildcat Silver Corporation (TSX: WS) ("Wildcat" or "the Company") is pleased to announce the results for 18
additional drill holes completed on the Company's Hermosa property
located in Santa Cruz County, Arizona. The current drill results
targeted extensions of the Manto Oxide Zone to the northeast and the
Upper Silver Zone southeast of the current Hermosa resource.
Highlights
Hole HDS-308, an infill drill hole within the Hermosa resource area, was
drilled for metallurgical sample material. Assay results from this
drill hole continue to support the resource and indicate the robust
nature of the Manto Oxide ore type. This drill hole intersected four
distinct zones of mineralization with the best interval returning 54.9 metres of 236.8 g/t silver, 7.41% manganese, 2.21% zinc, 1.18% lead
and 0.13% copper.
Hole HDS-291, located on the northeastern extent of the Wildcat patented
claim block, intersected three mineralized intercepts of the Upper
Silver Zone and five significant mineralized intercepts of the Manto
Oxide zone. This mineralization extends and leaves open the possible
expansion of the Hermosa resource off the patented claim block to the
north and east. Two significant intervals from the Manto Oxide zone
included:
-
4.9 metres averaging 201.7 g/t silver, 3.03% manganese, 0.35% zinc,
2.97% lead and 0.14% copper
-
12.5 metres averaging 150.3 g/t silver, 10.64% manganese, 1.07% zinc,
1.04% lead and 0.11% copper
Holes HDS-298 and HDS-303, both infill holes located in the patented
claim blocks to the southeast of the existing Hermosa resource,
returned significant upper silver zone mineralization. HDS-303 returned 15.2 metres of 131.1 g/t silver and HDS-298 returned
18.8 metres of 105.1 g/t silver.
The Company's most recent drill program completed in March 2012 included
212 drill holes for a total of approximately 55,700 metres. Following
this announcement, 15 drill holes with assays and analysis are still in
process and are expected to be released by the end of this quarter. A
total of 54% of the drill and assay values were included in the
February 2012 mineral resource estimate for the Hermosa project.
Wildcat expects to provide a further update to the current mineral
resource to incorporate all of the drilling in the third quarter of
this year. The Company also intends to deliver a preliminary economic
assessment in the third quarter of this year to include the updated
mineral resource and results of metallurgical testwork expected to be
completed by mid-year.
A summary of the drill results is provided below. Please also see attached map.
|
Hole ID
|
From
(metres)
|
To
(metres)
|
Interval
(metres)
|
Ag
(g/t)
|
Mn
%
|
Zn
%
|
Pb
%
|
Cu
%
|
Ore Zone
|
|
HDS-282
|
80.2
|
106.3
|
26.1
|
37
|
0.02
|
0.01
|
0.11
|
0.02
|
Upper Silver
|
|
HDS-282
|
148.5
|
159.1
|
10.7
|
52.8
|
16.49
|
1.39
|
0.38
|
0.08
|
Manto Oxide
|
|
HDS-282
|
173.2
|
177.7
|
4.6
|
54.5
|
2.3
|
3.52
|
1.12
|
0.07
|
Manto Oxide
|
|
HDS-282
|
244.8
|
262.8
|
18
|
123.5
|
11.01
|
2.83
|
3.67
|
0.2
|
Manto Oxide
|
|
|
|
|
|
|
|
|
|
|
|
|
HDS-291
|
144.2
|
148.8
|
4.6
|
39.3
|
0.01
|
0.02
|
0.30
|
0.03
|
Upper Silver
|
|
HDS-291
|
181.4
|
184.5
|
3.0
|
38.4
|
0.01
|
0.01
|
0.08
|
0.03
|
Upper Silver
|
|
HDS-291
|
201.8
|
207.8
|
5.9
|
51.0
|
0.01
|
0.01
|
0.09
|
0.01
|
Upper Silver
|
|
HDS-291
|
208.5
|
213.4
|
4.9
|
201.7
|
3.03
|
0.35
|
2.97
|
0.14
|
Manto Oxide
|
|
HDS-291
|
213.7
|
226.2
|
12.5
|
150.3
|
10.64
|
1.07
|
1.04
|
0.11
|
Manto Oxide
|
|
HDS-291
|
295.1
|
306.1
|
11.0
|
41.1
|
0.85
|
0.06
|
0.22
|
0.01
|
Manto Oxide
|
|
HDS-291
|
309.1
|
312.2
|
3.0
|
54.2
|
22.34
|
1.41
|
0.69
|
0.07
|
Manto Oxide
|
|
HDS-291
|
500.9
|
507.0
|
6.1
|
36.4
|
0.20
|
0.36
|
0.06
|
0.01
|
Manto Oxide
|
|
|
|
|
|
|
|
|
|
|
|
|
HDS-294
|
0.0
|
6.1
|
6.1
|
96.4
|
0.15
|
0.01
|
0.21
|
0.01
|
Upper Silver
|
|
HDS-294
|
19.8
|
38.1
|
18.3
|
41.2
|
0.05
|
0.01
|
0.13
|
0.01
|
Upper Silver
|
|
HDS-294
|
106.7
|
112.8
|
6.1
|
47.1
|
0.86
|
0.02
|
0.05
|
0.01
|
Upper Silver
|
|
|
|
|
|
|
|
|
|
|
|
|
HDS-295
|
6.1
|
30.5
|
24.4
|
40.2
|
0.18
|
0.01
|
0.03
|
0.01
|
Upper Silver
|
|
HDS-295
|
39.6
|
59.5
|
19.8
|
67.6
|
0.08
|
0.01
|
0.13
|
0.02
|
Upper Silver
|
|
HDS-295
|
73.2
|
77.7
|
4.6
|
55.1
|
1.15
|
0.07
|
0.01
|
0.04
|
Upper Silver
|
|
|
|
|
|
|
|
|
|
|
|
|
HDS-296
|
80.8
|
85.4
|
4.6
|
59.7
|
0.01
|
0.01
|
0.49
|
0.01
|
Upper Silver
|
|
|
|
|
|
|
|
|
|
|
|
|
HDS-297
|
0.0
|
27.4
|
27.4
|
40.3
|
0.04
|
0.01
|
0.09
|
0.01
|
Upper Silver
|
|
HDS-297
|
71.6
|
76.2
|
4.6
|
36.0
|
0.05
|
0.01
|
0.12
|
0.01
|
Upper Silver
|
|
|
|
|
|
|
|
|
|
|
|
|
HDS-298
|
48.2
|
66.9
|
18.8
|
105.1
|
0.49
|
0.04
|
0.20
|
0.02
|
Upper Silver
|
|
HDS-298
|
93.6
|
96.3
|
2.7
|
45.6
|
0.02
|
0.01
|
0.01
|
0.01
|
Upper Silver
|
|
|
|
|
|
|
|
|
|
|
|
|
HDS-299
|
3.0
|
19.8
|
16.8
|
36.6
|
0.02
|
0.01
|
0.04
|
0.01
|
Upper Silver
|
|
|
|
|
|
|
|
|
|
|
|
|
HDS-301
|
no significant mineralization
|
|
|
|
|
|
|
|
|
|
|
|
|
HDS-303
|
32.0
|
47.3
|
15.2
|
131.1
|
1.17
|
0.05
|
0.18
|
0.02
|
Upper Silver
|
|
HDS-303
|
274.4
|
323.2
|
48.8
|
42.0
|
7.24
|
0.24
|
0.04
|
0.01
|
Manto Oxide
|
|
|
|
|
|
|
|
|
|
|
|
|
HDS-304
|
12.2
|
39.6
|
27.4
|
78.7
|
0.18
|
0.01
|
0.34
|
0.01
|
Upper Silver
|
|
HDS-304
|
82.3
|
86.9
|
4.6
|
41.1
|
0.05
|
0.01
|
0.06
|
0.01
|
Upper Silver
|
|
|
|
|
|
|
|
|
|
|
|
|
HDS-305
|
47.3
|
53.4
|
6.1
|
31.9
|
0.22
|
0.02
|
0.14
|
0.01
|
Upper Silver
|
|
|
|
|
|
|
|
|
|
|
|
|
HDS-307
|
22.9
|
45.7
|
22.9
|
42.3
|
0.06
|
0.01
|
0.06
|
0.01
|
Upper Silver
|
|
HDS-307
|
54.9
|
62.5
|
7.6
|
153.1
|
2.85
|
0.08
|
0.21
|
0.01
|
Manto Oxide
|
|
HDS-307
|
158.5
|
161.6
|
3.0
|
38.1
|
0.10
|
0.01
|
0.07
|
0.01
|
Manto Oxide
|
|
|
|
|
|
|
|
|
|
|
|
|
HDS-308
|
12.2
|
67.1
|
54.9
|
236.8
|
7.41
|
2.21
|
1.18
|
0.13
|
Manto Oxide
|
|
HDS-308
|
70.1
|
74.7
|
4.6
|
37.9
|
1.01
|
1.22
|
0.35
|
0.02
|
Manto Oxide
|
|
HDS-308
|
80.8
|
83.8
|
3.0
|
42.0
|
1.11
|
1.65
|
0.19
|
0.03
|
Manto Oxide
|
|
HDS-308
|
93.0
|
97.6
|
4.6
|
42.2
|
1.42
|
2.97
|
0.53
|
0.02
|
Manto Oxide
|
|
|
|
|
|
|
|
|
|
|
|
|
HDS-309
|
33.5
|
44.2
|
10.7
|
72.1
|
0.52
|
0.02
|
1.23
|
0.05
|
Upper Silver
|
|
HDS-309
|
47.3
|
50.3
|
3.0
|
54.9
|
0.39
|
0.03
|
0.15
|
0.02
|
Upper Silver
|
|
HDS-309
|
80.8
|
83.8
|
3.0
|
53.7
|
3.10
|
0.69
|
0.77
|
0.05
|
Manto Oxide
|
|
|
|
|
|
|
|
|
|
|
|
|
HDS-310
|
no significant mineralization
|
|
|
|
|
|
|
|
|
|
|
|
|
HDS-311
|
15.2
|
19.8
|
4.6
|
33.3
|
0.01
|
0.01
|
0.04
|
0.02
|
Upper Silver
|
|
|
|
|
|
|
|
|
|
|
|
|
HDS-312
|
10.7
|
13.7
|
3.0
|
34.6
|
0.47
|
0.06
|
0.15
|
0.01
|
Upper Silver
|
|
HDS-312
|
53.4
|
80.8
|
27.4
|
65.8
|
0.04
|
0.02
|
0.09
|
0.02
|
Upper Silver
|
Note: Intervals reported are drill thicknesses as measured along the
core axis and are not true widths
A complete list of all drill intercepts, location map and 3D model of
the Hermosa mineralization are available on the company's website at www.wildcatsilver.com.
Qualified Person
The results of Wildcat's drilling results have been reviewed, verified
and compiled by
Don Taylor
, MSc., PG, President and Chief Operating
Officer for Wildcat Silver, a qualified person as defined by National
Instrument 43-101 (NI 43-101). Mr. Taylor has more than 25 years of
mineral exploration and mining experience, and is a Registered
Professional Geologist through the SME. Mr. Taylor is also a Licensed
Professional Geologist in several US states.
Assays and Quality Assurance/Quality Control
To ensure reliable sample results, Wildcat has a rigorous QA/QC program
in place that monitors the chain-of-custody of samples and includes the
insertion of blanks, duplicates, and certified reference standards in
each batch of samples. Core is photographed and split in half with
one-half retained in a secured facility for verification purposes.
Sample preparation (crushing and pulverizing) is performed at Skyline
Laboratories, an ISO/IEC accredited lab located in Tucson, Arizona.
Skyline Laboratories prepares two pulps of all samples and completes
analysis of one pulp sample by ICP for Cu% (copper), Pb% (lead), Zn%
(zinc) and Mn% (manganese). The second pulp is shipped to Inspectorate
Labs, an ISO: 9001-2008 accredited laboratory in Reno, Nevada, where
the duplicate pulp is analyzed for Au (gold) and Ag (silver). Silver
values are determined by gravimetric fire assay (1 AT) with gold values
determined by an AA finish from the same dore bead: Final silver value
is the weight of the dore bead minus the AA gold value. In certain
drill holes Skyline completes analyses of pulps for gold (FA-1AT/AA)
and silver is determined by multi-acid digestion/AA finish. If the
silver value is greater than 150 gpt the sample is redone by
gravimetric FA (1AT) with the gravimetric gold value subtracted. At
both labs if the FA/AA Au value is greater than 3 gpt the Au assay is
repeated by FA gravimetric methods. Certain duplicate pulps have
gold-silver QA/QC checks run at Skyline by the above methods. Also
certain duplicate pulps also have Cu, Pb, Zn, Mn QA/QC checks a using
ICP/AA methods and 30 element spectral ICP determined at Inspectorate
after 4-acid digestion.
About Wildcat
Wildcat is a Canadian mineral exploration company focused on development
of Hermosa, its 80% owned silver project located in Santa Cruz County,
Arizona. The project currently has an indicated mineral resource of
101.4 million tonnes averaging 53.18 grams per tonne silver for a total
of 171.3 million ounces of silver in addition to an inferred mineral
resource of 83.6 million tonnes averaging 36.42 grams per tonne silver
for a total of 98.6 million ounces of silver as announced in the
February 6, 2012 press release.
Cautionary Note Regarding Forward-Looking Information
Certain information contained in this press release constitutes
forward-looking statements. All statements, other than statements of
historical facts, are forward looking statements, including information
concerning the Company's plans for its mineral property in Arizona
including the preparation and timing of further mineral resource
updates, preliminary economic assessments and metallurgical testwork.
Forward-looking statements are often, but not always, identified by the
use of words such as may, will, seek, anticipate, believe, plan, estimate, budget, schedule, forecast, project, expect, intend, or similar expressions.
The forward-looking statements are based on a number of assumptions
which, while considered reasonable by the Company, are subject to risks
and uncertainties. In addition to the assumptions herein, these
assumptions include the assumptions described in the Company's
management's discussion and analysis for the period ended December 31,
2011 ("MD&A"). The Company cautions readers that forward-looking
statements involve and are subject to known and unknown risks,
uncertainties and other factors which may cause actual results,
performance or achievements to differ materially from those expressed
in or implied by such forward-looking statements and forward-looking
statements are not guarantees of future results, performance or
achievement. These risks, uncertainties and factors include general
business, economic, competitive, political, regulatory and social
uncertainties; actual results of exploration activities and economic
evaluations; fluctuations in currency exchange rates; changes in
project parameters; changes in costs, including labour, infrastructure,
operating and production costs; future prices of silver and other
minerals; variations of mineral grade or recovery rates; operating or
technical difficulties in connection with exploration, development or
mining activities, including the failure of plant, equipment or
processes to operate as anticipated; delays in completion of
exploration, development or construction activities; changes in
government legislation and regulation; the ability to maintain and
renew existing licenses and permits or obtain required licenses and
permits in a timely manner; the ability to obtain financing on
acceptable terms in a timely manner; contests over title to properties;
employee relations and shortages of skilled personnel and contractors;
the speculative nature of, and the risks involved in, the exploration,
development and mining business; and the factors discussed in the
section entitled "Risks and Uncertainties" in the MD&A.
Although the Company has attempted to identify important risks,
uncertainties and other factors that could cause actual performance,
achievements, actions, events, results or conditions to differ
materially from those expressed in or implied by the forward-looking
information, there may be other risks, uncertainties and other factors
that cause performance, achievements, actions, events, results or
conditions to differ from those anticipated, estimated or intended.
Unless otherwise indicated, forward-looking statements contained herein
are as of the date hereof and the Company disclaims any obligation to
update any forward-looking statements, whether as a result of new
information, future events or results or otherwise, except as required
by applicable law.
About Reserves and Resources
This press release uses the terms indicated and inferred resources as a
relative measure of the level of confidence in the resource estimate.
Readers are cautioned that: (a) mineral resources are not economic
mineral reserves; (b) the economic viability of resources that are not
mineral reserves has not been demonstrated; and (c) it should not be
assumed that further work on the stated resources will lead to mineral
reserves that can be mined economically. In addition, inferred
resources are considered too geologically speculative to have any
economic considerations applied to them. It cannot be assumed that all
or any part of an inferred mineral resource will ever be upgraded to a
higher category. Under Canadian rules, estimates of inferred mineral
resources may not form the basis of feasibility or pre-feasibility
studies or economic studies except for certain preliminary economic
assessments. Readers should also refer to the Company's Annual
Information Form for the period ended December 31, 2011 and other
continuous disclosure documents available at www.sedar.com, which is subject to the qualifications and notes set forth therein.